The site is allocated as Green Belt within the South Ribble Local Plan, in a characteristically rural area.
Acland Bracewell’s instructions were to provide strategic planning advice, architectural design service, full project management of the planning application and full planning application process. We prepared a submission to the Local Planning Authority for the demolition of a range of existing buildings and the erection of 9.no detached dwellings.
Working with the architect, appointed technical team and engaging with the Local Planning Authority both at the pre-application stage and during the application process, Acland Bracewell has successfully obtained full planning permission for the development in the Green Belt on behalf of the client, following a unanimous approval at Planning Committee.