We are delighted to have obtained full planning permission on behalf of Nutrel Products Ltd for the erection of a replacement industrial building (Use Class B2/B8) within a rural location in West Lindsey, Lincolnshire.
The building will create 1,929m2 of floorspace and the proposal included the demolition of an existing storage building, which was no longer fit for purpose, and the implementation of a sustainable drainage system. Our client required the building for the manufacture and storage of organic fertiliser product.
Acland Bracewell’s instructions were to provide a turnkey service in conjunction with Wareing Buildings, a leading steel building manufacturer and supplier. Our scope of work included the provision of strategic advice, architectural and planning services and full project management from conception to consent. A number of technical documents were prepared in-house, including a Flood Risk Assessment, Sustainable Drainage Strategy and Landscaping Plan. Acland Bracewell also oversaw the management of external technical consultants.
Full Planning Permission was secured with no pre-commencement conditions. Following the approval, Acland Bracewell were instructed to discharge the conditions.
Meet Abigayle, Our Expert in Planning & Development
Interested in working with us? Get in touch