Established in 1988, The Plant Place Garden Centre Limited retails an extensive range of high-quality plants and has become the number one destination for houseplants in the North West. The site comprises existing retail operations, including internal and external retail areas, as well as car parking, situated within the Green Belt as outlined in the Wyre Local Plan. The Site lies within Flood Zone 3.

The client’s objectives for this project are not only to support economic business expansion, but to enable The Plant Place to continue to provide an exceptional staff experience and to support the charities and organisations that are close to their heart.

The proposed Café comprises a total floorspace of 532m2, incorporating an innovative and beautiful design as a result of good architecture and high-quality materials, including vertical and horizontal timber cladding in cedar and grey/ larch, which is reflective of buildings found in rural areas and pays homage to the agricultural (horticultural) history of the site.

Acland Bracewell’s instructions were to provide tailored strategic advice, architectural design service, full project management of the planning application preparation and planning application process, community led engagement strategy, pre-application engagement with the local planning authority, to submission of the planning application for erection of café (Use Class E(b) and open sided canopy and additional parking following demolition of existing polytunnel.

Significant technical and architectural design work was undertaken, working collaboratively with the client to meet their business requirements and timescales and the appointed contractor. Acland Bracewell engaged extensively with the Local Planning Authority through pre-application engagement to seek to reduce pre-commencement conditions, taking into consideration the time scales for the project delivery.

Acland Bracewell assisted in the successful discharge of pre-commencement conditions and project management of the s.278 Agreement relating to access works in the public highway.